This is S13 from PL01 — matching materials to their use — running as P-MATCH inside a 1920×1080 player frame. The learner text is in Malay by design (course language) and still illustrative until storyboard v2 is copied in.
Open the primitive page 16 deck interactions, liveRecognise and locate 3 patterns
The learner shows where something is, or what is wrong, on a site image.
Hotspots on an imageP-HOTSPOT
deck3–6 meaningful locations on one site photo — leak points, inspection points, system parts.
Spot the fault on siteP-SPOT-FAULT
siteAn installation photo with 2–3 deliberate faults; the learner marks what is wrong. Strong for inspection and safety.
Label the diagramP-LABEL
standardA section diagram (membrane layers, substrate layers) to be named — drag labels onto parts.
Classify and match 3 patterns
The learner sorts items into groups or pairs two lists.
Match two listsP-MATCH
deckMaterial ↔ use, tool ↔ task, symptom ↔ cause. Screen S13 in PL01 is a real example.
Sort into categoriesP-SORT-BIN
standardItems belong in 2–4 bins (allowed / not allowed, floor / wall / roof).
Accept / reject gateP-GATE
deckOne rule, many items; the learner predicts whether each item passes or is rejected, and every rejection has a reason. Good for specifications and conditions.
Sequence 2 patterns
The learner shows the correct order of work.
Order the work stepsP-SEQUENCE
standardA 4–7 step procedure where order matters — surface preparation before coating, inspection before closing.
Guided step-by-stepP-STEPPER
deckA procedure revealed one step at a time; the learner controls the pace but cannot skip.
Compare 3 patterns
The learner sees two states side by side and understands the difference.
Before / afterP-COMPARE-SLIDER
deckCorrect vs wrong installation on the same image; condition before vs after treatment.
Parameter sliderP-SCRUB
deckOne variable changes the outcome — coating thickness, slope, drying time — and the learner sees the effect.
Two views, one screenP-TOGGLE
deckSpecification vs site reality; plan vs as-built; what should be vs what happened.
Decide 4 patterns
The learner makes a choice and sees the consequence.
Reject the misconceptionsP-REJECT-ALL
deckEvery wrong answer is a common misconception with its own reason; the learner may try all of them before the right answer opens. Strong for “why not this one”.
Branching scenarioP-BRANCH
standardSite situation → choice → consequence → next choice. 2–3 levels, one correct path and educational wrong paths.
Pre-work checklistP-CHECKLIST
siteItems that must be confirmed before work starts — PPE, surface condition, weather. The learner ticks; missed items are explained.
Remove what does not belongP-REMOVE
deckA list of materials, tools or steps containing 1–3 wrong items; the learner removes them.
Explore and reveal 4 patterns
The learner opens dense content a little at a time — also the main tool for staying no-scroll.
Flip cardsP-FLIP
standardTerm → definition, image → name, question → answer. 4–6 cards.
Accordion / tabsP-ACCORDION
standardContent that is genuinely long but splits into 3–5 independent sections. The safest way to avoid scrolling.
Peel the layersP-LAYER
siteA layered system — waterproofing, insulation, substrate — opened one layer at a time with name and function.
Hold / releaseP-HOLD
deckA stop-work decision simulation: conditions change, the learner must hold the process when a condition is not met. No known K1 screen yet.
Test and apply 4 patterns
The learner proves understanding — this is where score and SCORM status live.
Quiz with rationaleP-MCQ
standardFormal assessment at the end of a topic; every option shows its rationale after answering.
Video with pause questionsP-VIDEO-PAUSE
standardA 1–3 minute demonstration video that stops at 1–2 points for one question.
Simple estimateP-ESTIMATE
siteMaterial quantity or coverage for a given area; 2–3 inputs, one result. Only if the formula comes from the module source.
Park the issue, continue the workP-PARK
deckThe learner identifies an issue that is not an immediate blocker and parks it with an owner so the main work can continue. No known K1 screen yet.